Well No. 23
Yrybucua Central Church
Technical Details
Sponsor: Dalton First United Methodist Church, Dalton, Georgia
Drilling date: Oct 31-Nov 14, 2007
Location: Latitude - S24° 28.787’ Longitude - W 056° 05.195'
Elevation: 183 meters above mean sea level
Total cost: $1,715
Drill depth: 47.1 meters
Soil types encountered: clayey sand and sandstone
Static groundwater level: 10.2 meters below top of casing
Dynamic groundwater level: N/A - hand pump
Installed well depth: 46.1 meters
Length of screened section: 18 meters
Length of gravel packed section: 27 meters
Length and type of sealed section: 1 meter of bentonite pellets
Pump description: Hand pump
Depth to base of pump: 36 meters
Flow rate: N/A - hand pump
|