Well No. 25
Replacement Well at
Y'Apy Methodist Church
Technical Details
Sponsor: The Memorial United Methodist Church, Fernandina Beach, Florida
Drilling date: May 20 - July 10, 2008
Location: Latitude - S 24°29.499' Longitude - W 56° 06.889' - Approx 5 km from the town of Yrybucua
Elevation: 209 meters above sea level
Total cost: $3,852
Drill depth: 59 meters (194 ft.)
Soil types encountered: Sand and clay, with soft to hard sandstone at depth
Static groundwater level: 14.6 meters below ground surface
Dynamic groundwater level: 40 meters
Installed well depth: 59 meters
Length of screened section: 24 meters
Length of gravel packed section: 26 meters
Length and type of sealed section: Approx. 1 meter of bentonite pellets
Pump description: 1 hp mono-phase electric submersible
Depth to base of pump: 56 meters
Flow rate: 1,500 liters/hour
|
Home | Ed & Linda | Photos | Journal | Newsletters | Well Projects | Stories | Links | Can I Help |