Well No. 3
Quinta Linea Methodist Church and School
Technical Details
Sponsor: The Memorial United Methodist Church, Amelia Island, Florida
Drilling date: December 1, 2002
Location: Latitude - S 24°26.216' Longitude - W 56°07.816'
Elevation: 224 meters above mean sea level
Total cost: $ 2,324
Drill depth: 46 meters
Soil types encountered: Sandy clay, clay, fine sand, sandstone
Static groundwater level: 12.7 meters below ground surface
Dynamic groundwater level: ____ meters below ground surface
Installed well depth: 44 meters
Length of screened section: 18 meters
Length of gravel packed section: 20 meters
Length and type of sealed section: 1.5 meters cement/bentonite grout
Pump description: Electric submersible, 1 HP, single phase 220 volt
Depth to base of pump: 39 meters
Flow rate: 2,000 liters per hour
Water analysis results: Microbiologic -
Microscopic -
|