Well No. 3

Quinta Linea Methodist Church and School

 Technical Details

 

Sponsor:    The Memorial United Methodist Church, Amelia Island, Florida

Drilling date: December 1, 2002

Location:   Latitude -   S 24°26.216'       Longitude - W 56°07.816'

Elevation:   224 meters above mean sea level

Total cost:    $ 2,324

Drill depth: 46 meters

Soil types encountered:    Sandy clay, clay, fine sand, sandstone

Static groundwater level:   12.7 meters below ground surface

Dynamic groundwater level:  ____  meters below ground surface

Installed well depth:  44 meters

Length of screened section:  18 meters

Length of gravel packed section:  20 meters

Length and type of sealed section:  1.5 meters cement/bentonite grout

Pump description:    Electric submersible, 1 HP, single phase 220 volt

Depth to base of pump:   39 meters

Flow rate:    2,000   liters per hour 

Water analysis results: Microbiologic -

                                            Microscopic -

 

 

Home | Ed & Linda | Photos | Journal | Newsletters | Well Projects | Stories | Links | Can I Help