Well No. 21
Methodist Technical School - Yrybucua
Technical Details
Sponsor: St. Mark UMC, in Memory of Vera Taylor's husband
Drilling date: Aug 22-27, 2007
Location: Latitude - S24° 28.654’ Longitude - W 056° 05.106'
Elevation: 175 meters above mean sea level
Total cost: $2,781
Drill depth: 60.8 meters
Soil types encountered: clayey sand and sandstone
Static groundwater level: 12.2 meters below top of casing
Dynamic groundwater level: 20 meters below top of casing
Installed well depth: 60.0 meters
Length of screened section: 18 meters
Length of gravel packed section: 36 meters
Length and type of sealed section: 1 meter of bentonite pellets
Pump description: 1 hp electric submersible pump
Depth to base of pump: 38 meters
Flow rate: 2,000 liters per hour
|