Well No. 26
Palomita Methodist Church
Technical Details
Sponsors: May Wooten and Dade County High School, Trenton, Georgia and
St. Mark United Methodist Church, Pensacola, Florida
Drilling date: July 15 - 17, 2008
Location: Latitude - S 24°33.639' Longitude - W 56° 14.723'
Elevation: 175 meters above sea level
Total cost: $3,853
Drill depth: 55 meters (181 ft.)
Soil types encountered: Sand and clay, with soft, clean sandstone at depth
Static groundwater level: 9.36 meters below ground surface
Dynamic groundwater level: 31.3 meters
Installed well depth: 53 meters
Length of screened section: 18 meters
Length of gravel packed section: 20 meters
Length and type of sealed section: Approx. 1 meter of bentonite pellets
Pump description: 1 hp mono-phase electric submersible
Depth to base of pump: 50 meters
Flow rate: 2,500 liters/hour
|
Home | Ed & Linda | Photos | Journal | Newsletters | Well Projects | Stories | Links | Can I Help |