Well No. 18
Nuevo Horizonte Godoy Family
Technical Details
Sponsor: Larry Hunter Development Corp., Hiram, Georgia
Drilling date: Feb 12-16, 2007
Location: Latitude - S24° 25.998’ Longitude - W 056° 07.929'
Elevation: 204 meters above mean sea level
Total cost: $1,723
Drill depth: 37.5 meters
Soil types encountered: clayey sand and sandstone, clean coarse sand at depth
Static groundwater level: 12.8 meters below ground surface
Dynamic groundwater level: unknown (hand pump)
Installed well depth: 36 meters
Length of screened section: 12 meters
Length of gravel packed section: 23 meters
Length and type of sealed section: natural soil
Pump description: 2 inch cylinder hand pump
Depth to base of pump: 30 meters
Flow rate: N/A
|
Home | Ed & Linda | Photos | Journal | Newsletters | Well Projects | Stories | Links | Can I Help |