Well No. 18

Nuevo Horizonte Godoy Family

 Technical Details

 

Sponsor:    Larry Hunter Development Corp., Hiram, Georgia

Drilling date: Feb 12-16, 2007

Location:   Latitude -   S24° 25.998’       Longitude - W 056° 07.929' 

Elevation:    204 meters above mean sea level

Total cost:    $1,723

Drill depth:  37.5 meters

Soil types encountered:    clayey sand and sandstone, clean coarse sand at depth

Static groundwater level: 12.8 meters below ground surface

Dynamic groundwater level:  unknown (hand pump)

Installed well depth:  36 meters

Length of screened section:  12 meters

Length of gravel packed section:  23 meters

Length and type of sealed section:  natural soil

Pump description:    2 inch cylinder hand pump

Depth to base of pump:   30 meters

Flow rate:    N/A

 

Home | Ed & Linda | Photos | Journal | Newsletters | Well Projects | Stories | Links | Can I Help