Well No. 16

Nuevo Horizonte Methodist Church

 Technical Details

 

Sponsor:    The Memorial United Methodist Church, Fernandina Beach, Florida

Drilling date: Oct 23 to Nov 13, 2006

Location:   Latitude -   S24° 25.831’       Longitude - W 056° 09.035' 

Elevation:   219 meters above mean sea level

Total cost:    $1,970

Drill depth: 65.3 meters

Soil types encountered:    clayey sand and sandstone

Static groundwater level: 33 meters below ground surface

Dynamic groundwater level:  unknown (hand pump)

Installed well depth:  65.0 meters

Length of screened section:  18 meters

Length of gravel packed section:  45 meters

Length and type of sealed section:  1 meter of bentonite pellets

Pump description:    2 inch cylinder hand pump

Depth to base of pump:   51 meters

Flow rate:    N/A

 

Home | Ed & Linda | Photos | Journal | Newsletters | Well Projects | Stories | Links | Can I Help