Sponsor: The Memorial United Methodist Church, Fernandina Beach, Florida
Drilling date: Oct 23 to Nov 13, 2006
Location: Latitude - S24° 25.831’ Longitude - W 056° 09.035'
Elevation: 219 meters above mean sea level
Total cost: $1,970
Drill depth: 65.3 meters
Soil types encountered: clayey sand and sandstone
Static groundwater level: 33 meters below ground surface
Dynamic groundwater level: unknown (hand pump)
Installed well depth: 65.0 meters
Length of screened section: 18 meters
Length of gravel packed section: 45 meters
Length and type of sealed section: 1 meter of bentonite pellets
Pump description: 2 inch cylinder hand pump
Depth to base of pump: 51 meters
Flow rate: N/A
|