Well No. 15

Nueva Asunción Methodist Church

 Technical Details

 

Sponsor:    JW and Glenna Davis, Dublin, Texas

Drilling date: April 18-19, 2006

Location:   Latitude -   S24° 26.979’       Longitude - W 056° 10.880' 

Elevation:   246 meters above mean sea level

Total cost:    $2,800

Drill depth: 45.6 meters

Soil types encountered:    clayey sand and sandstone

Static groundwater level:  9 meters below ground surface

Dynamic groundwater level:  14.4  meters below ground surface

Installed well depth:  45.0 meters

Length of screened section:  16 meters

Length of gravel packed section:  25.4 meters

Length and type of sealed section:  1 meter of bentonite pellets

Pump description:    Electric submersible, 1 HP, single phase 220 volt

Depth to base of pump:   41 meters

Flow rate:    3,100   liters per hour 

 

Home | Ed & Linda | Photos | Journal | Newsletters | Well Projects | Stories | Links | Can I Help