Well No. 15
Nueva Asunción Methodist Church
Technical Details
Sponsor: JW and Glenna Davis, Dublin, Texas
Drilling date: April 18-19, 2006
Location: Latitude - S24° 26.979’ Longitude - W 056° 10.880'
Elevation: 246 meters above mean sea level
Total cost: $2,800
Drill depth: 45.6 meters
Soil types encountered: clayey sand and sandstone
Static groundwater level: 9 meters below ground surface
Dynamic groundwater level: 14.4 meters below ground surface
Installed well depth: 45.0 meters
Length of screened section: 16 meters
Length of gravel packed section: 25.4 meters
Length and type of sealed section: 1 meter of bentonite pellets
Pump description: Electric submersible, 1 HP, single phase 220 volt
Depth to base of pump: 41 meters
Flow rate: 3,100 liters per hour
|
Home | Ed & Linda | Photos | Journal | Newsletters | Well Projects | Stories | Links | Can I Help |