Well No. 20
Methodist Church Camp
Technical Details
Sponsor: Mariners Sunday School Class, Oak Grove United Methodist Church, Atlanta, Georgia
Drilling date: May 1 to May 11, 2007
Location: Latitude - S 25° 50.92’ Longitude - W 57° 17.34'
Elevation: 114 meters above mean sea level
Total cost: $4,497
Drill depth: 38 meters (125 feet)
Soil types encountered: sand and clay to 20 feet, hard sandstone with quartz encountered at 120 feet.
Static groundwater level: 7.55 meters (24.8 feet) below ground surface
Dynamic groundwater level: 20.8 meters (68 feet) below ground surface
Installed well depth: 35.3 meters (116 feet)
Length of screened section: 18 meters
Length of gravel packed section: 22.1 meters
Length and type of sealed section: 1 meter of bentonite pellets
Pump description: 1 hp electrical submersible pump
Depth to base of pump: 33 meters (108.6 ft)
Flow rate: 1,014 liters per hour (4.45 gpm)
|