Well No. 7
Ara Pyahú Church and Parsonage
Technical Details
Sponsor: Mike and Kathy Graham (Cannon United Methodist Church) and the Pursuits Sunday School Class at Highland Park UMC
Drilling date: February 7, 2004
Location: Latitude - S 24° 36.560' Longitude - W 56° 01.659'
Elevation: 295 meters above mean sea level
Total cost: $ 2,748
Drill depth: 91 meters (300 feet)
Soil types encountered: Dense clay, fine sand, soft sandstone
Static groundwater level: 62 meters below ground surface
Dynamic groundwater level: 72 meters
Installed well depth: 91 meters
Length of screened section: 33 meters
Length of gravel packed section: 35 meters
Length and type of sealed section: Approx. 1 meter of bentonite pellets
Pump description: 1 hp mono-phase electric submersible
Depth to base of pump: 82 meters
Flow rate: 1,000 liters/hour
Water analysis results: Not yet tested
|
Home | Ed & Linda | Photos | Journal | Newsletters | Well Projects | Stories | Links | Can I Help |